To submit a building permit in Island County, a site registration and septic design, along with approved access permit, address, and water availability verification will be required starting March 1, 2024. Septic Design must be completed by a qualified septic designer and submitted to Health for review. Permits without these items will not be accepted for submittal.
Flood Development Pre-Application Meetings are required prior to Building Permit submittal. Meetings will be held in person, or virtual, from 10-11 AM, Tuesdays on Whidbey Island and Fridays on Camano Island. All time slots are first-come, first-served. Email Vicki Mertins or call 360-678-7869 to schedule a conference. Click here for FDP application and FDP Checklist for submittal.
You may also submit Flood Development Permits digitally by email to Buildingdept@islandcountywa.gov.
See the Building Permit Applications web page for a full list of downloadable forms.
Reminder: New and replacement roofing projects require a building permit
New Single Family Residence (SFR), new Accessory Structure Building Permits and solar racking are now being accepted in person and via our online Public Portal.
Note: Garage/Shop on parcels under 2.5 acres without a residence are restricted to 800 square feet.
Type | Description | Link or Form |
---|---|---|
Address | As pending or issued by the Island County Planning Department | Site Address Application (PDF) |
Approved Access Permit | As issued by the Island County Public Works Department | Access Permit Application (PDF) |
Approved "WAV" (Water Availability Verification) Form (Approved within the Year) | As issued by the Island County Health Department | Water Availability Verification (Public WS) (PDF) Water Availability Verification (Individual Well) (PDF) |
As-Built / Approved Septic Permit or Applicable Sewer District | As issued by the Island County Health Department or applicable Sewer District | Application to Construct a Septic System |
Holmes Harbor Sewer District
360-331-4636
Building Permit Applications are accepted until 2 p.m.
You can apply via U.S. Mail or in person at the Planning Department front counter in the Coupeville office or at the Camano Annex.
Along with the Completed Application, the following shall be provided:
Yes. If you have a Land Use submittal appointment, upon arrival let the front receptionist know that you also have a Building Permit submittal. The Land-Use Application must be accepted in order to also intake the Building Permit application and plans. Because of the limited quantity of guest cottages, they are excluded from concurrent review.
A Washington state licensed contractor is required. And yes, you are able to do the work yourself. However, an Owner/Contractor Form must be signed by the owner and submitted with the Building Permit Application.